Built:  1983

This facility consists of one level. No basement. Not heated or cooled. 1,080 square feet.

The structural system consists of reinforced concrete footings and foundation walls supporting the wood frame structure.

The floor structure is reinforced concrete slab on grade.

Floor covering consists of basically exposed structure.

No partitions.

No ceilings.

The exterior walls are basically prefinished metal panel on wood studs.

No plumbing. Not heated or cooled.

Minimal electric for facility.

Condition: Good

Occupancy: Equipment

Estimated Replacement Cost: $40,000.00