Master Plan
Campus Map Possible Clinton Climate Initiative (CCI) Projects
|
Facilities Master PlanMaintenance StorageBuilding Description and Use: Built: 1979This facility consists of one level. No basement. 504 square feet. The structural system consists of reinforced concrete footings and foundation walls supporting the pre-engineered steel frame structure. The floor structure is reinforced concrete slab on grade. No partitions. No ceilings. The exterior walls are basically prefinished metal panel. The roof structure is pre-engineered with prefinished metal panel cover. No plumbing. Minimal electric for facility. Condition: Good Occupancy: This building is currently used to store maintenance materials. Estimated Replacement Cost: $50,000.00 |