Parking Lot Number |
Location/
Construction Date/
Type of Pavement |
Faculty Slots |
Student Slots |
Reserved Slots |
Handicap Slots |
1 |
North Rundell
Constructed: 2002
Type: Rigid |
0 |
80 |
6 |
6 |
2 |
Lee Drive
Constructed: 2002
Type: Rigid |
20 |
120 |
2 |
4 |
3 |
South Arena
Constructed: 2002
Type: Rigid |
0 |
145 |
0 |
4 |
4 |
Tucker Hall
Overlaid: 2001
Type: Flexible |
57 |
137 |
1 |
7 |
5 |
North Bonner Hall
Overlaid: 2001
Type: Flexible |
15 |
117 |
0 |
6 |
6 |
East Bonner Hall
Expanded: 2002
Type: Rigid |
0 |
73 |
0 |
2 |
7 |
South Bonner Hall
Constructed: 1969
Type: Rigid |
49 |
0 |
0 |
7 |
8 |
Tech. Voc. Horseshoe
Constructed: 1967
Type: Flexible |
17 |
0 |
4 |
0 |
9 |
South Tech. Voc. 2 & 8
Constructed: 1967
Type: Flexible |
3 |
25 |
0 |
3 |
10 |
McNulty Haddick
Constructed: 1950
Modified: 2002
Type: Rigid |
21 |
95 |
0 |
6 |
11 |
NE Lot
Constructed: 2002
Type: Rigid |
0 |
185 |
0 |
8 |
TV-10 |
TV-10
Constructed: 1975
Type: Rigid |
0 |
30 |
0 |
2 |
Tennis Courts |
Tennis Courts
Constructed: 2002
Type: Rigid |
0 |
24 |
0 |
1 |
North Central Plant |
North Central Plant
Constructed: 2002
Type: Rigid |
0 |
12 |
2 |
0 |
Gulf Street |
Gulf Street
Constructed: Unknown
Type: Flexible |
0 |
87 |
0 |
0 |
ALC |
ALC
Constructed: 2000
Type: Flexible |
3 |
18 |
0 |
1 |
Maintenance |
Maintenance
Constructed: 1976
Type: Rigid |
16 |
8 |
0 |
0 |
South of RR |
South of RR |
0 |
50 |
0 |
0 |
MHC Theater |
MHC Theater
Constructed: 1950
Type: Rigid |
2 |
4 |
0 |
4 |
Gray Child Care Ctr |
Gray Child Care Ctr
Constructed: Approx. 1970
Type: Rigid |
0 |
5 |
0 |
1 |
Republic Whiting S |
R/W South
Constructed: Approx 1950
Type: Flexible |
7 |
6 |
0 |
0 |
Republic Whiting N |
R/W North
Constructed: 2002
Type: Rigid |
0 |
38 |
0 |
2 |
Texas Ave. Complex |
Surrounds the Texas Ave. Complex with most parking on the North side/
Constructed:
1968/
Type:
Rigid |
0 |
83 |
2 |
4 |
Totals |
1,545 |
210 |
1,342 |
17 |
68 |